- Recent construction 1990
- Steel structure - cement blocks and brick finish
- Fully sprinklered
- Ceiling Height 21 feet clear
- Truck Level & Ground Level
-
Well insulated building, Class A roof with min. R-factor of 21
- Heating - Gas suspended units
- Located one block from Carrefour Angrignon Shopping Mall
- Bus stop in front of building and 10 minute walk to metro
-
10 minutes drive to Downtown Montreal area
4300 s.f. - 60% offices
6400 s.f. - 2 truck level + drive-in
2500 s.f. offices with a/c
6500 s.f. - 2 truck level
1700 s.f. offices with a/c
21 ft. clearance